Wednesday, 2 September 2009

Art & Design

So today was the big day of testing. We had brief 30 min to make any final adjustments while the gap was being set up. Each bridge was first tested with the Thomas the Tank Engine in both directions. Then it was on to the fun stuff. Weight was gradually added to the train to see which could take the most before destruction.

-Insert video-

‘Bridge over GA GA’ was victorious taking over 800g of weight before it gave way.

0 comments:

Post a Comment